Menu Close

Basement Renovations Ottawa

Ottawa Basement Renovations That Add Real Living Space and Real Value

TRANSFORMED BASEMENTS

We turn unfinished basements into living spaces you'll love

Basement Finishing
Basement Framing
Basement In-Law Suite
Basement Home Office
Basement Bathroom Renovation
Basement Wet Bar Installation
Basement Bedroom Addition
Basement Electrical & Plumbing
Basement Drywall
Basement Subflooring
FREQUENTLY ASKED QUESTIONS

Everything Ottawa homeowners ask about basement renovations

Final pricing depends on layout complexity, finishes, and structural conditions.
Yes — almost always. The City of Ottawa requires permits for finishing basements, adding bathrooms, building bedrooms (egress windows), or creating in-law suites. We handle permit drawings, applications, and inspections so you stay 100% compliant.
Yes — Ottawa allows secondary dwelling units (SDUs) in most residential zones. Legal SDUs require proper egress, fire separation, sound insulation, separate heating control, and a certified kitchen. We've built dozens of compliant Ottawa basement suites.
Most Ottawa basement renovations take 6–10 weeks. Simple finishing (open recreation room) can finish in 5 weeks. Full in-law suites with kitchen and bathroom typically take 10–14 weeks including permits, framing, mechanical, drywall, finishes, and final inspections.
We assess every basement before quoting — checking for cracks, efflorescence, slope, weeping tile, and humidity. We install dimple membrane subfloor systems (DMX, Delta-FL, or Barricade), proper vapour barriers, and rigid foam insulation to keep finished basements dry through Ottawa winters.
Ontario Building Code requires a minimum 6'5" finished ceiling height in most habitable basement spaces. If your basement is tight, we use slim drop ceilings, low-profile flooring, and recessed lighting to maximize headroom. Bulkheads can be designed around ductwork.
Yes. Legal basement bedrooms require an egress window of minimum 0.35 sq m unobstructed opening, with a clear opening at least 380mm in any direction, located no higher than 1.5m above the floor. We coordinate egress window cuts with licensed concrete cutters.
Permits, design plans, framing, insulation, vapour barrier, electrical, plumbing, HVAC adjustments, drywall, flooring, doors, trim, paint, lighting, bathroom (if included), kitchen (if included), egress windows (if needed), full cleanup, and final inspections.